

This NW Washington DC rowhouse project is the combination of a smaller hallway bathroom and a bedroom combined into a master bathroom and laundry.

This NW Washington DC bathroom renovation was in a 2nd floor condo apartment. The building was built in the early 1900"s thus requiring replacement of the plumbing and electrical components plus significant reframing at the walls and floor.


This NW Washington DC bathroom renovation was in a high-rise condo apartment building. The renovation consisted of replacing all bathroom fixtures and tile.

This Adams Morgan condo apartment bathroom renovation consisted of removing the existing toilet and sink then reinstalling them after the new work was completed. Removing the existing wall and floor tile, protecting the existing tub, replacing the existing plumbing pipes and shower faucet, installing new tile underlayment, building a niche at the side shower wall, installing new floor and wall tile, painting, new hardware, new light fixture, etc.














































